<div dir="auto">Hi guys, working on the exoskeleton for the SeaQuestor, dry fitting the rear thrusters with the new machined mount tubes, horizontal wing thrusters,  and forward wing lights. The rear thruster assembly includes a segment with external ports for air compensatation and future sensors. My thru hull penatration plates are at the shop having final machining and shoud be ready in a week. With a total of 30 port locatations I have plenty for future connections. I also get to make a few design esthetic changes as the cnc ribs were cut from my 3d model 1 year ago and it did not reflect recent revisions. But thats half the fun of design. Build a mock up and then make refinements. I hope to have the full set of rib stations adjusted and locked into position on the keel stand this weekend so i can start the foam cutting. <div dir="auto">Best Regards,</div><div dir="auto">David</div></div>