<div dir="auto">Hi guys, well we had progress this week, even if the cnc plasma machine quit working before our 3/4" sail plate was cut. All of our t-rings were rolled, and the forward sail tower template was completed, dry fit into the opening and then transcribed into the computer for the cnc plasma to cut once it's back up and running. All hull penetratation size and locations verified and ready to be cut next week. Next week, periscope tube, and 6" dia thru hull holes, forward and aft equipment frames to be cut and fit. <div dir="auto">David</div></div>